Cookies on the Schlüter-Website

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Further information

logo

Schlüter®-TROBA-PLUS/-PLUS-G

Installation

  1. The load bearing substrate and the waterproofing layer placed on it must be adequately sloped toward and connected to the designated drainage exit. Prior to installing Schlüter®-TROBA-PLUS, larger uneven areas in the sloped waterproofing assembly should be levelled with an appropriate mortar.
  2. Independent of the slope, Schlüter®-TROBA-PLUS is placed loosely over the waterproofing membrane (filter fabric side up). Adjoin sections of Schlüter®-TROBA-PLUS by abutting the edges and overlapping the filter fabric.
  3. The surface assembly is installed directly over the placed Schlüter®-TROBA-PLUS according to current industry standards.
  4. Please note: With respect to edging profiles, movement joints and floor/wall transitions, please refer to our profile types: Schlüter®-BARA and Schlüter®-DILEX.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit