Cookies on the Schlüter-Website

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Further information

logo

Schlüter®-LIPROTEC-LLPM /-LLP /-LLPE

Installation

  1. For information on installing the supply cable, the power supply and the controller, refer to the installation manual. (QR code for web download, see below).
  2. Before the modules are installed, their functionality has to be checked.
  3. In advance, the supply cable has to be positioned as appropriate for the cable opening in the profile.
  4. The LED strip has to be removed from the profile before the profile is installed. During installation of the profile, the connection joint of the cable has to be routed through the opening in the profile from the rear.
  5. If used in a wet zone (area with direct contact to water), the IP-protected LED strip has to be shortened at an angle of 45° at the marked positions. The Schlüter-PROCUT handheld snip tool is suitable. Make sure that the LED strip has been separated from the power supply before working on it. The cut edges of the LED strip have to be waterproofed with the supplied silicone sealing caps and special glue. First, apply an adequate amount of glue to the bonding surfaces of the silicone sealing cap. Then, insert the silicone sealing cap into the LED strip and press it in position for approx. 30 seconds. Check whether the end cap is properly connected to the LED strip. Remove excess glue with a cloth. After a curing period of approx. 30 minutes, the silicone end cap is firmly glued in place. The LED strip has been sealed and can now be used.
  6. After the profiles have been installed, the LED strip is connected to the supply cable by means of the plug- &-play connection and is carefully pressed into the profile. For more information on installation, refer to the supplied assembly manual.

Installation in wet zones
The modules can be installed in wet environments (e.g. showers) by using the Schlüter-LIPROTEC-PZH hollow wall box with attached waterproofing collar. It creates a hollow space for connecting, to reversibly install the plug-and-play LED modules. To insert the hollow wall box, a cutout with a size of 40 x 120 mm and a depth of min. 20 mm has to be made in the wall. The connection cable has to be routed through to the profiles opening. Make sure that the heat shrink tube on the connection cable ends up in the area with the sealing collar. The cable connection is fastened crosswise with two cable ties (included) and thus sealed. Any excess of the cable ties can be shortened. The hollow wall box is placed in the cutout produced and the sealing collar is sealed on the bonded waterproofing with Schlüter-KERDI-COLL-L. The self-adhesive KERDI collar has to be placed in such a way that the hollow wall box is sealed on all sides. Make an opening only where the cable opening of the attachment profile will be positioned.


Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?