Cookies on the Schlüter-Website

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Further information

logo

Schlüter®-INDEC

  1. Select Schlüter®-INDEC according to the tile thickness.
  2. Apply tile adhesive to the area where the tile covering will end, using a notched trowel. If Schlüter®-INDEC is to be installed in an exterior wall corner, complete the tiling of one wall, then apply tile adhesive in the corner area of the second wall.
  3. Press the perforated anchoring leg of Schlüter®-INDEC securely into the setting material and align the profile.
  4. Trowel additional setting material over the perforated anchoring leg to ensure full coverage.
  5. Solidly embed the adjoining tiles and align them flush with the top edge of the profile. The tiles must be fully embedded in the area of the profile.
  6. Leave a gap of approx. 1.5 mm. Completely fill the space between the tile and the profile with grout.
  7. Use suitable materials and tools for the sensitive surfaces to avoid scratches or other damage. Residue of mortar and tile adhesive should be removed immediately.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Metal surfaces
Metal surfaces

All surfaces at a glance

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit