Cookies on the Schlüter-Website

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Further information

logo

Schlüter®-ECK-E

Installation

  1. Select Schlüter®-ECK-E according to tile thickness.
  2. Apply appropriate tile adhesive to areas where the perforated anchoring legs will be placed. Make sure the adhesive is suitable for the substrate.
  3. Press the profile securely into the setting material and align.
  4. Trowel additional setting material over the anchoring legs to ensure full coverage and support of the tile edges.
  5. Solidly embed the tiles so that the tiled surface is flush with the top of the profile.
  6. A joint of approximately 2 mm should be left between the tile and the profile. This joint is filled completely during the grouting process of the tile covering.
  7. Remove the protective foil immediately after grouting.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Metal surfaces
Metal surfaces

All surfaces at a glance

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit