Cookies on the Schlüter-Website

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Further information

logo

Schlüter®-DILEX-MOP

Installation

  1. Select the profile height according to the height of the assembly.
  2. Set the profile flush against the edge of completed covering segments. The lateral profile parts must be solidly embedded in the mortar.
  3. Install the adjacent covering segment flush with the top edge of the profile and solidly embed it in the mortar.
  4. Fill the remaining joint space between the profile and the covering completely with grout.

Installation note on joint repair:
Insert or tap the profile into the appropriately prepared joint chamber and fill the joint space between the profile and the covering completely with grout, epoxy, or dry-set mortar.


Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit