Schlüter®-DILEX-KS/-KSA/-EKSB

Installation Schlüter®-DILEX-KS

Installation for tile and natural stone surfaces:

  1. Select Schlüter®-DILEX-KS according to the tile thickness.
  2. Apply tile adhesive to the area where profile is to be installed, using a notched trowel.
  3. Press the trapezoid perforated anchoring leg of Schlüter®-DILEX-KS firmly into the adhesive and align it. The profile must align directly with expansion and movement joints in the substrate below.
  4. Trowel tile adhesive over the trapezoid perforated anchoring leg to ensure full coverage. Trowel tile adhesive against the vertical anchoring legs at an angle.
  5. Firmly press the adjoining tiles into place and align them in such a way that the upper profile edge is flush with the tile (profile should not protrude over the surface of the covering; preferably, it should be approx. 1 mm below the top level of the covering). The tiles must be fully embedded in the area of the profile. Always adjoin the uncut tile edge to the profile.
  6. Leave a 2-mm joint to the profile, and completely fill the joint between the profile and the tile with mortar.
  7. When creating cross joints, trim the profiles to ensure that the trapezoidperforated anchoring legs do not overlap in installation. The tile inserts Schlüter®-DILEX-KS/-K are available in all colours for neat joint appearance.

 

Installation for coatings:

  1. Select Schlüter®-DILEX-KS according to the thickness of the covering.
  2. Apply a contact layer in the area where profile is to be installed.
  3. Press the trapezoid perforated anchoring leg of Schlüter®-DILEX-KS firmly into the adhesive and align it. The profiles may need to be cleaned and degreased prior to installation. The profile must align directly with expansion and movement joints in the substrate below.
  4. Trowel coating material over the trapezoid perforated anchoring leg. The finished surface coating should be flush with the upper edge of the profile.
    Note:
    The profile should not be higher than the coating surface but flush or up to approx. 1 mm lower.

 

Installation Schlüter®-DILEX-KSA

  1. Select Schlüter®-DILEX-KSA according to the tile thickness.
  2. Apply tile adhesive to the area where the profile is to be installed, using a notched trowel.
  3. Peel off the silicone paper of the selfadhesive strip at the profile. Attach the profile to the cleaned structural element with the self-adhesive strip in such a way that the trapezoid perforated anchoring leg can be pressed into the fresh tile adhesive.
  4. Trowel tile adhesive over the trapezoid perforated anchoring leg to ensure full coverage. Trowel tile adhesive against the vertical anchoring legs at an angle.
  5. Firmly press the adjoining tiles into place and align them in such a way that the upper profile edge is flush with the tile (profile should not protrude over the surface of the covering; preferably, it should be approx. 1 mm below the top level of the covering). The tiles must be fully embedded in the area of the profile. Always adjoin the uncut tile edge to the profile.
  6. Leave a 2-mm joint to the profile, and completely fill the joint between the profile and the tile with mortar.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Metal surfaces
Metal surfaces

All surfaces at a glance

Schlüter colour key
Schlüter colour key

From brilliant white to brick red - here you will find an overview of all available product colours.

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit