Schlüter®-DILEX-HKU

  1. Apply tile adhesive to the area where profile is to be installed, using a notched trowel.
  2. Press the perforated anchoring leg of the profile securely into the setting material and align it. In case of thicker coverings, place suitable material underneath the anchoring leg to match the selected covering thickness.
  3. Place the corresponding prefabricated parts over profile joints and internal and external corners, using a permanently elastic sealant. Remove all surface substances, lubricants etc. that may weaken the bond from the adhesive areas prior to applying the sealant. The prefabricated parts should overlap the adjoining profile ends by at least 10 mm.
  4. The tiles adjoining the profile (minimum thickness = 6 mm) must be solidly embedded into the setting material and aligned to be flush with the profile.
  5. Leave a space of approx. 2 mm between the tile and the profile for subsequent grouting.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Metal surfaces
Metal surfaces

All surfaces at a glance

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit