  1. Select Schlüter®-DILEX-EDP according to tile thickness. 
  2. Using a notched trowel, apply tile adhesive to the area where the profile will be placed. 
  3. Press the perforated anchoring legs of Schlüter®-DILEX-EDP into the adhesive bed and align. The profile must align directly with expansion and movement joints in the substrate below.
  4. Completely cover the perforated anchoring legs with tile adhesive. Apply tile adhesive to the vertical profile section at an angle. 
  5. Firmly press the adjoining tiles into place and adjust them in such a way that the upper lip of the profile is flush with the tile (Note: The profile should not be higher than the tile, but rather flush or up to approx. 1 mm lower). All tiles in the profile area must be solidly bedded. Always lay the uncut section of a tile against the profile. 
  6. Leave a joint of approx. 2 mm between the tile and the profile; fill the joint completely with grout.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Metal surfaces
Metal surfaces

All surfaces at a glance

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit