Cookies on the Schlüter-Website

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Further information

logo

Schlüter®-DECO-SG

Installation

  1. Select Schlüter®-DECO-SG according to the tile thickness.
  2. Apply tile adhesive to the area where the tile covering will end, using a notched trowel.
  3. Press the trapezoid-perforated anchoring leg of Schlüter®-DECO-SG firmly into the adhesive and align it.
  4. Trowel additional tile adhesive over the perforated anchoring leg to ensure full coverage.
  5. Firmly press the adjoining tiles into place and align them in such a way that they are flush with the upper profile edge. The tiles must be fully embedded in the area of the profile.
  6. Leave a joint of approximately 1.5 mm and completely fill the space between the tile and the profile with grout.
  7. Use suitable materials and tools for the sensitive surfaces to avoid scratches or other damage. Residue of mortar and tile adhesive should be removed immediately.
  8. Glass elements may be inserted into Schlüter®-DECO-SG after the final installation. Important: The glass may not be in direct contact with the profile. Use suitable spacers and seal the joints with silicone.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Metal surfaces
Metal surfaces

All surfaces at a glance

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit