  1. DIN waterproofing:
    The profiles must be attached to the substrate prior to installing the waterproofing assembly, for example with a cold bitumen adhesive. The waterproofing membrane can then be adhered up to the drainage openings to prevent water seepage. Seal the abutting seams of the profiles with the self-adhesive anchoring fleece Schlüter®-BARA-HV. Note: The applicable standard requires a width of 150 mm for integrating materials such as zinc or copper sheets. It is therefore recommended to discuss this issue with the customer before installing Schlüter®-BARARKL, which has a width of 110 mm.
  2. Waterproofing with Schlüter®-KERDI:
    The profiles must be attached to the substrate with a suitable adhesive prior to installing the waterproofing assembly, for example with Schlüter®- KERDI-COLL. Seal the abutting seams of the profiles with the self-adhesive anchoring fleece Schlüter®-BARA-HV (see Fig 1). Next, Schlüter®- BARA-HV is fully embedded on the anchoring legs of the profiles (see Fig. 2). Remove all substances (such as lubricants etc.) that may weaken the bond from the adhesive areas prior to applying the anchoring fleece. Schlüter®-KERDI can then be adhered up to the drainage openings to prevent water seepage. Adhere Schlüter®- KERDI to the anchoring leg with the sealing adhesive Schlüter®-KERDI-COLL.
  3. If the waterproofing has already been installed, attach the profile to the waterproofing assembly with a suitable adhesive and adjust the profile to position. Ensure that the waterproofing layer is already connected to a drip lip or gutter system.
  4. a. If Schlüter®-BARA-RKL/-RKLT is used as a gravel edge profile, the gravel layer is spread over the drainage mat Schlüter®-TROBA or Schlüter®-TROBAPLUS and should abut the vertical profile leg just below the upper lip. The gravel or crushed stone must be contained to stabilize this edge area. The pavers are then laid loosely on top of the levelled gravel layer.
    b. In case of coverings supported by stilts such as Schlüter®-TROBA-STELZ, the exterior contact points are positioned on the anchoring legs of the profiles. In a next step, the pavers are installed over the casting mold rings.
  5. Profile ends should abut with a distance of approx. 5 mm, with the gap covered by clip-on connectors. Pre-formed parts are available for interior and exterior corners. 5
  6. Once the covering is completely installed, the Schlüter®-BARIN gutter system can be fastened to the Schlüter®- BARA-RKLT profile using the screws included. The slotted holes allow for slope adjustment, if required. Note: It must be assured that the drainage openings of the profiles are not fully closed during the installation.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Schlüter colour key
Schlüter colour key

From brilliant white to brick red - here you will find an overview of all available product colours.

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit