Cookies on the Schlüter-Website

Cookies help us deliver our services. By using our services, you agree to our use of cookies. Further information

logo

Schlüter®-BARA-ESOT

Installation

  1. Apply a foam insulation strip to the wall at the height of the skirting.
  2. Embed the perforated anchoring leg of Schlüter®-BARA-ESOT into the contact layer of the floor surface while pressing the profile against the insulation strip.
  3. The floor tiles are embedded into the tile adhesive over the anchoring leg, ensuring complete coverage.
  4. Apply tile adhesive to the back of the base tiles and attach to the vertical leg of the profile. The adhesive must penetrate the profile perforations to ensure firm adhesion of the base tiles. Prior application of the foam strip prevents a force-conductive bond to the wall. A joint of approximately 5 mm should be left between the floor tile and the base tile. The joint must then be filled completely with grout.
  5. The wall connection above the skirting shall be sealed with a flexible sealing compound.
  6. Please note: The base tile must either meet or exceed the height of the skirting support profile. However, the foam insulation strip must be applied at full skirting height.

Contact Schlüter-Systems Ltd

Units 3-5 Bardon 22,
Beveridge Lane, Coalville,
Leicestershire, LE67 1TE
Phone: +44 (0) 1530 813396

Quick contact list

Reach the department of your choice directly via email:

image
Write To Us!

Do you have a question or suggestion?

Further information

on our products and specifications can be found here:

Metal surfaces
Metal surfaces

All surfaces at a glance

Legend "Products"

We use the following symbols and abbreviations to illustrate our price charts.

image image

= new products

= radius perforation available   

 

Dimensions:
H = height
L = length
B = width


Packaging:
PL = euro pallet 
KV = case packaging 
BV = bundle (there is a 10 item bundle packaging for all the profile types)
P = box packaging 
R = roll
St. = unit